Short Descriptions

60501 Cock oÕ the North spent eighty - three days in Doncaster Works between 24 June and 14 September 1944 being rebuilt to Class A2/2 and received the Diagram 118 boiler during a general overhaul at Doncaster between 17 September and 24 October 1952. 605

R3832 Hornby OO Gauge LNER, Thompson Class A2/3, 4-6-2 500 'Edward Thompson' - Era 3 Real Coal & Glossy Weathering by TMC

Sale
£184.49 -40% £307.49
3 In Stock
Inclusive of all taxes
3 AVAILABLE
SKU#: R3832COALTMC
Sale
£184.49 -40% £307.49
3 In Stock
Inclusive of all taxes

Details

Product Info

500 Edward Thompson entered traffic on 24 May 1946 at Gateshead, before changing sheds three times in the next four months. Eventually settling at Kings Cross from 12 September 1946, at nationalisation Edward Thompson was given the temporary British Railways number of E500, before being renumbered as 60500 on 7 October 1949.

As top line duties dwindled, 60500 Edward Thompson was moved to Peterborough's New England shed on 4 June 1950, where the locomotive remained until withdrawal on 16 June 1963.

Manufacturer

Hornby

Finish

Weathered By TMC

Scale

OO Gauge (1:76 Scale)

Era (Period of operation)

Era 3 (1923-1947)

DCC Ready

Yes (8 Pin)

Condition

New

R3832 Hornby OO Gauge LNER, Thompson Class A2/3, 4-6-2 500 'Edward Thompson' - Era 3 Real Coal & Glossy Weathering by TMC

Sale
£184.49 -40% £307.49
3 In Stock
Inclusive of all taxes
3 AVAILABLE
SKU#: R3832COALTMC
Sale
£184.49 -40% £307.49
3 In Stock
Inclusive of all taxes
;