Short Descriptions
60505 Thane of Fife spent eighty - five days in Doncaster Works being rebuilt as a Class A2/2 the heavy overhaul taking place between 26 October 1942 and 18 January 1943 and the Diagram 118 boiler was fitted during a general overhaul at Doncaster between
R3831 Hornby OO Scale BR, Thompson Class A2/2, 4-6-2, 60505 'Thane of Fife' - Era 5
Sale
£177.64
-15%
£208.99
Out Of Stock
Manufacturer
Hornby